免费日韩片_欧美成人精品一区二区男人小说_国产乱码一区二区三区四区_国产精品国产三级国产aⅴ入口_成人看的污污超级黄网站免费_欧美一级在线免费观看_成人午夜免费无码福利片_国产乱人伦偷精品视频色欲_aaa少妇高潮大片免费看_国产精品1234_亚洲精品国产suv一区88_中文字字幕在线中文无码_精品亚洲区_午夜九九九_国产av国片精品jk制服丝袜_色综合亚洲_亚洲成av人片无码bt种子下载_欧美色就色_精品少妇的一区二区三区四区_男人用嘴添女人下身免费视频

 
 

Home/Our Business/Municipal Projects

Jila Dike Lengshuichong Drainage Pump Station Project (China)

Updated: 2014-03-19

With a length of 2,609m and a protection area of 4.32 km2, Jila Dike is designed to protect 88,100 people and its design criterion for flood control is 50 years. The dike is equipped with three drainage pump stations with the installed capacity of 4,680kw. Located in the middle of Jila Dike, the Lengshuichong drainage pump station is equipped with eight pumps, with a total installed capacity of 2,640kw and design pump flow of 248 m3 per second.

Jila Dike Lengshuichong Drainage Pump Station Project (China)
Jila Dike Lengshuichong Drainage Pump Station Project

Jila Dike Lengshuichong Drainage Pump Station Project (China)
Jila Dike Lengshuichong Drainage Pump Station Project

 

Related articles
 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.